It control the
operations while processing the product (scheduling, costing, confirmation,
capacity, quality inspection, rework) this key is mandatory in routing/recipes and has a
various option for entering
- Control key is basically used in Operations (Routing or Master recipe). With the use of control key u Choose Scheduling, capacities, cost, rework, automatic GR should be considered for the Operation or not.
- Standard value key: In Standard there will be 3 parameters defined and if we want to configure separately we can configure a maximum of 6 parameters for Standard value Key.
0 Response to "SAP PP - Control key, Standard value key "
Post a Comment